The existing roof sheathing will be inspected. All damaged or rotted sheathing will be replaced prior to the installation of the new roofing materials. |
| |
A layer of high-quality roofing felt will be installed to serve as an underlayment for the shingles and an additional moisture barrier. |
| |
Valley flashings that are fabricated with an inverted V-shaped standing diverter will be installed in all valleys. All of our standard flashings contain a baked-on enamel finish to prevent rust and corrosion. These flashings typically outlast the other roofing materials. |
| |
The field materials (shingles) will be installed using the proper fasteners and according to the manufacturers specifications and local building codes. |
| |
Step-Flashings will be installed on all adjoining walls and interlaced with the new roof shingles. A kick-out flashing will be installed at the bottom of every step-flashing “run” to insure that water is diverted to the outside of siding materials below the run. |
| |
Roof and soffit vents will be installed to provide an adequate and balanced ventilation system. The quantity and placement of vents are determined by our Analysis of Existing Conditions. An adequate ventilation system is necessary to insure the elimination of moisture in the attic. Excess moisture may lead to ice dams, interior mold/mildew and premature failure of the roofing materials. This may, in turn, void the manufacturer's material warranty. |
| |
New step-flashings will be installed around chimneys and skylights, and caulked. |
| |
New plumbing vent flashings and new furnace flue flashings will be installed, interlaced with the new roof shingles, and caulked. |
| |
New ridge materials, matching the field shingles, will be installed according to the manufacturer’s specifications. The ridge shingles will be installed in a straight line and will provide the finishing touch to the installation - both technically and aesthetically. |
| |
Clean-up around your home is a very critical step. Your property will be inspected to insure that all debris is removed. |
| |
A special magnet with wheels will be used to remove all loose nails daily. |
| |